Monday, August 21st, 2017

Our Philippine House Project – Construction Cost Report 4-21-10

0



Our Philippine House Project:  new construction cost report as of April 21, 2010 Project after 70 work days 4-19-10 House Construction Expense 1/1/2010 through 4/21/2010 (in U.S. Dollars) House Construction Expense – YTD:2 1/1/2010 through 4/22/2010 (in U.S. Dollars) Category Description 1/1/2010- 4/22/2010 House Construction 31,080.37 Equipment 2,484.79 Labor 5,866.73 Materials best online casino 21,756.69 Soft Costs 972.16 OVERALL TOTAL 31,080.37 Equipment 2,484.79 Labor 5,866.73 Materials 21,756.69 Soft Costs 972.16 OVERALL TOTAL $31,080.37 Number of workers: 8 Cost per square meter P9,324 so far. Cost figures include a P200,000 ($4,500)

See the original post here:
Our Philippine House Project – Construction Cost Report 4-21-10



Related Posts:

Speak Your Mind

Tell us what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!

CommentLuv badge