Sunday, June 18th, 2017

House Construction Expense 1/1/2010 through 5/22/2010 (in U.S. Dollars) House Construction 40,904.32 Equipment 2,545.19 Labor 7,095.75 Materials 30,251.73 Soft Costs 1,011.65 OVERALL TOTAL 40,904.32 Includes stockpiled materials, almost all electrical and plumbing supplies and fixtures.  Electrical work about 50% complete.  Plumbing about 75% complete. Includes work on 35 square meter carport.  Next step finishing the walls (cement plaster) inside and out. House Construction Expense Our Philippine house building project – construction cost report as of 5-22-10. Roof completed 1/1/2010 through 5/22/2010 (in U.S. Dollars) Equipment 2,545.19 (Most to be sold at end of project. Concrete vibrator

Our Philippine House Project:  new construction cost report as of April 21, 2010 Project after 70 work days 4-19-10 House Construction Expense 1/1/2010 through 4/21/2010 (in U.S. Dollars) House Construction Expense – YTD:2 1/1/2010 through 4/22/2010 (in U.S. Dollars) Category Description 1/1/2010- 4/22/2010 House Construction 31,080.37 Equipment 2,484.79 Labor 5,866.73 Materials 21,756.69 Soft Costs 972.16 OVERALL TOTAL 31,080.37 Equipment 2,484.79 Labor 5,866.73 Materials 21,756.69 Soft Costs 972.16 OVERALL TOTAL $31,080.37 Number of workers: 8 Cost per square meter P9,324 so far. Cost figures include a P200,000 ($4,500)

House after 60 days of construction. March 27, 2010 See the latest construction cost report at http://goiloilo.com/our-philippine-house-project-construction-cost-report/