Being your own contractor in the Philippines.  Our Philippine house building project is almost  complete.  After our unhappy experiences with hiring an architect to build our perimeter fence (see _____)  we decided to hire our own crew to build our house.  We hired an architect to do the plans and to come for site visits on an as-needed basis.  We shopped for our own materials and supervised the work with help from a foreman. Was this a success?  It looks like it’s going to cost us about 2.5 million pesos for our 150 square meter house or about P16,500 per square meter.  Houses can be built for that amount or less, but we tried to use top quality materials, so we feel as though we have gotten a…

We’re building a house in the Philippines.  This will show how we’ve constructed our floors; filling, compacting, reinforcing bars, pouring concrete and tiling. The height of the fill contained within the perimeter walls of the house is adjustable based on local conditions.  Our house is located on level agricultural land on Panay Island.  We want the have our finished floors about one meter above the surrounding terrain because we wanted to avoid any possibility of storm water entering the finished house.  We already…

Our biggest Philippine house building blunders. В We don’t want to present our project as a paragon of perfection, so here we show what went wrong during our Philippine house construction project and why, in the hope that others can learn from our mistakes. Most of these photos also appear in other sections of the site. No room for concrete in this column This photo shows the top of a 15…

Building our house in the Philippines.  We decided to set up our own “welding shop” on-site.  The roof framing is all steel; trusses (15.5 meters long), center beam, purlins, and cornice framing.  All will be constructed on-site by our crew, two of…

Building our house in the Philippines. January 31, 2010.  We’ve just ended the first two weeks of construction.  We’re generally pleased with the progress.  We have thirteen workers on our crew including two foremen.  I’m on-site most of the time so there are three “bosses”. So far we’ve spent about $8,000 including “soft costs” (architecture, permits), equipment, materials and labor.  We’d like to keep our total cost to about P15,000 per square meter or about $50,000 for the 150 square meter house.  Every day one faces decision which affect the cost.  Should we use 6″ block for a stronger house — it only costs a P30,000 pesos more!  Should the concrete floor be a bit thicker to reduce the chance of cracking?  Should we use 1/4″ thick angle bar in building our roof trusses or the thinner…