House Construction Expense 1/1/2010 through 5/22/2010 (in U.S. Dollars) House Construction 40,904.32 Equipment 2,545.19 Labor 7,095.75 Materials 30,251.73 Soft Costs 1,011.65 OVERALL TOTAL 40,904.32 Includes stockpiled materials, almost all electrical and plumbing supplies and fixtures.  Electrical work about 50% complete.  Plumbing about 75% complete. Includes work on 35 square meter carport.  Next step finishing the walls (cement plaster) inside and out. House Construction Expense Our Philippine house building project – construction cost report as of 5-22-10. Roof completed 1/1/2010 through 5/22/2010 (in U.S. Dollars) Equipment 2,545.19 (Most to be sold at end of project. Concrete vibrator

We are building a house on Panay Island in the Philippines.  We’ve documented our project with photos, text and building cost reports.  Here’s the index to our posts: A forest of bamboo scaffolding 3-10-2010 An index to posts about our Philippine house building project. A few of the links are not yet “live” but will become so as the project progresses. Our Philippine house:  Buying our lot Our Philippine house:  Building a perimeter fence Our Philippine house:  Filling the lot Our Philippine house:  House Design Our Philippine house:  Architects and builders Our Philippine house:  Digging a water well Our Philippine house:  Building a bamboo house – a “bahay kubo” Our Philippine house:  Buying construction equipment Our Philippine house:  Buying hollow block (cement …